epssupport

July 14, 2025

5 MIN READ

Building Industrial Momentum in Saud – The Execution Gap and How EPS Fills It

Saudi Arabia’s Drive for Execution Excellence

In 2025, Saudi Arabia stands at a critical point in its industrial transformation. With Vision 2030 in full motion, billions of riyals are being channeled into energy, infrastructure, and manufacturing projects.

Yet, while the Kingdom has made significant progress in planning, a recurring challenge persists across multiple sectors: the execution gap.

This is where EPS Support enters the scene—not just as a consulting firm, but as a hybrid execution partner combining compliance strategy with full-spectrum contracting and mobilization solutions.

In this blog, we unpack why execution delays occur, how EPS Support fills this critical void, and how we helped a major industrial client deliver a multi-site plant mobilization within Aramco timelines.

Why Execution Lags Behind Ambition in KSA

The Saudi industrial sector is rapidly expanding, but execution remains a bottleneck. According to a 2025 report by the Gulf Industrial Development Forum, 37% of large-scale projects in the Kingdom face delays exceeding 6 months, primarily due to:

  • Vendor onboarding delays due to complex prequalification systems like Aramco’s SAP Ariba and IKTVA compliance documentation.

  • Site mobilization challenges, especially in remote or newly designated industrial zones.

  • Fragmented procurement and logistics planning, causing delays in material and equipment availability.

  • Shortage of trained and certified manpower aligned with Aramco, NEOM, or SABIC standards.

  • Lack of integration between strategic advisory and on-ground execution teams.

These issues result in budget overruns, lost investor confidence, and misalignment with national development timelines.

EPS Support’s Model: Strategy + Execution = Momentum

EPS Support was purpose-built to address this gap by integrating Aramco-approved consultation services with its new Contracting Division. Our model ensures that clients move from prequalification to project launch seamlessly under one operational umbrella.

1. Compliance-First Consulting

EPS offers industrial compliance consulting in KSA, aligning your project from day one with Aramco’s standards, IKTVA requirements, ISO, and environmental codes. Our team works directly with clients on:

  • Vendor registration with Aramco and SABIC

  • SAP Ariba onboarding

  • Safety audits, quality protocols, and prequalification documents

  • IKTVA and local content score optimization

2. Turnkey Contracting Division

Once strategy and compliance are in place, EPS activates its Contracting Division, offering:

  • Site mobilization in Saudi Arabia (temporary camps, site offices, HSE protocols)

  • Certified manpower provisioning, trained on Aramco/NEOM safety and site SOPs

  • Procurement of Aramco-approved materials, leveraging our trading partnerships

  • Multi-site project setup, including scaffolding, welding, electrical, and structural crews

This hybrid strategy ensures no handoff delays between planning and execution, allowing real-time rollout aligned with Vision 2030 targets.

Case Study: Multi-Site Plant Mobilization within Aramco Timelines

Client: Tier-1 EPC company supplying structural components to Aramco’s Jafurah Gas Development Program
Challenge: Delayed execution of three interconnected plant sites due to vendor registration setbacks, untrained labor, and lagging procurement

EPS Support Solution:

  • Fast-tracked Aramco vendor registration and IKTVA optimization within 30 days

  • Activated Contracting Division for site mobilization within 10 working days

  • Deployed over 120 trained site personnel under EPS contracting licenses

  • Sourced and delivered over 70% of project materials via EPS’s Aramco-approved trading company channel

  • Enabled full operational readiness within 6 weeks—two weeks ahead of Aramco’s compliance audit

Outcome:

  • Client avoided Aramco penalties for timeline breaches

  • Achieved IKTVA score improvements, unlocking future project bids

  • Project completed on time, with EPS now retained for long-term industrial compliance consulting

Saudi Arabia Needs Execution-Driven Partners

In the race to localize industry, meet net-zero targets, and become a hub for global manufacturing, Saudi Arabia doesn’t just need consultants—it needs execution enablers. EPS Support understands the regulatory DNA of the Kingdom while possessing the operational muscle to deploy projects rapidly and compliantly.

Whether you’re an international investor entering the Saudi market, or a local company scaling operations under IKTVA mandates, EPS is your single-window partner—from paperwork to project handover.

Conclusion: From Vision to Verified Execution

Vision without execution is delay. In 2025, with massive opportunities being created across Saudi industrial zones, closing the execution gap is critical.

EPS Support has built a model that ensures compliance, mobilization, and procurement are synchronized—giving industrial clients a real competitive advantage.

You may like more...